UK perspective. Global industry.
AboutAdvertiseReading list
THEAUTOMOBILEDAILY

The business of mobility.
The decisions that move it.

INDUSTRY TOOLS / DEPOT WINDOW PLANNER

Ready for the next shift?

Screen charging energy against your shared window, connector capacity and site power.

Your depot scenario

Illustrative inputs. An energy screen, not an electrical design or a departure schedule.

Make the assumptions explicit.

Grid energy required = vehicles × battery energy per vehicle ÷ efficiency. Available energy = the smaller of reserved site power or active connector power × hours. Active connectors cannot exceed the number of vehicles. A separate check tests whether one connector can deliver one vehicle’s requirement within the window.

Assumes constant usable power, identical energy needs and every vehicle available throughout. It excludes tapering, queuing and individual departure times. Check battery limits, electrical capacity and installation requirements with the responsible specialists.