UK perspective. Global industry.
AboutAdvertiseReading list
THEAUTOMOBILEDAILY

The business of mobility.
The decisions that move it.

Home›Coverage
Commercial & FleetGuide

Chargepoint location is a depot workflow decision

Locating a charger involves more than finding a spare wall or parking bay. Fleet operators need to examine vehicle movements, pedestrian routes, loading access and the practical connection routine before approving a depot layout.

Email story
white truck on road during daytime
Illustrative photograph · Gabriel Santos / Unsplash

A charger can be electrically well placed and operationally inconvenient. Long cable routes, awkward parking positions or conflicts with loading can turn a routine connection into an additional yard task. The location decision should therefore involve the people who use the depot, alongside the specialists designing the installation.

Follow a vehicle through the yard

Map the sequence from entry to parking, loading, charging and departure. Observe how that sequence changes during busy periods or between shifts. Consider where a vehicle waits while another task is completed. A proposed charging bay may work on a drawing while occupying space that the operating team relies on for temporary staging.

Check the dimensions and connection position of the intended vehicles. A layout that suits one model may create an awkward cable position for another. Examine doors, tail lifts, trailers and body equipment as well as the cab. Treat future fleet variation as a design question rather than assuming every replacement will park and connect identically.

Keep people in the design

Review pedestrian routes, lighting and access to controls. Drivers need to connect and disconnect without an unnecessary walk through vehicle movements or a reach around equipment. HSE's site layout checklist offers a useful reference for the wider transport review. The charging project should fit that review instead of creating a separate enclave.

Include visiting staff and less frequent users. A regular driver may learn an awkward routine that a relief driver cannot infer. Clear signs, sensible control positions and an understandable reporting process reduce reliance on local memory. Accessibility should be discussed with the design team early, while changes to the layout are still straightforward.

Anticipate occupation without charging

Decide how the bays will be used when a connected vehicle has finished charging or when a non charging vehicle needs to park. Moving vehicles solely to release a charger creates labour and coordination requirements. If those movements are part of the design, define when they happen and who is permitted to make them.

Consider whether allocated bays, shared bays or a combination fits the fleet. The answer depends on arrivals, departure priorities and the number of useful parking positions. A shared charger that requires frequent shuffling may be less convenient than a simpler arrangement that allows vehicles to remain parked throughout their available dwell time.

Test the proposed routine

Before final acceptance, walk through the layout with representative vehicles and the intended users. Test cable handling, signs, lighting and reporting instructions under the conditions the depot will experience. Check whether neighbouring activities can block access. Record concerns so they become design decisions rather than informal compromises after installation.

Revisit the layout when routes, shifts or vehicle bodies change. Charging is now part of the depot's production process, and its location affects how smoothly that process runs. A good placement makes connection an ordinary part of parking while preserving the rest of the yard's work and the separation of people from moving vehicles.

Sources & further reading

HSE: Site layout and internal traffic routes checklist ↗

Official reference for reviewing vehicle movements, pedestrians, parking and visiting users within depot layout.

Welsh Government: Electric vehicle charging infrastructure procurement technical advice note ↗

Reference for connecting charging procurement with actual energy demand and available downtime; numerical charger recommendations omitted.

Prepared 2026-10-13. Source references retained from that edition. Corrections and feedback.

Email story
NEXT

Follow the story

All coverage